Restauration du pont Colbert EN

Pont Colbert
Colbert Bridge ©FrançoisThomas
False
Restoration of Colbert Bridge

Brief overview 

Listed as a Historic Monument in 2020, Colbert Bridge has undergone a comprehensive restoration. Its structure, made up of a combination of original puddled iron and post-war steel, had suffered significant deterioration and has now been fully restored. The roadway has been refurbished and the pavements widened and made fully accessible to people with reduced mobility.

The civil engineering works included the restoration of the circular paving in the bridge's swing area, the repair of the staircases, abutments and quay coping, as well as the refurbishment of the control cabin and the renovation of the machinery building façade. The project also features architectural lighting to showcase the bridge at night.

The bridge reopened to road traffic and pedestrians on 8 July 2026 and is currently undergoing a commissioning phase, during which its operation is being monitored and fine-tuned under real operating conditions.

A small number of finishing works are still underway, including:

  • completion of the restoration of the machinery building;
  • landscaping of the bridge swing area.  

 

Learn more about these historic works on the dedicated website!  

 

Useful information
Budget Pont Colbert EN

Budget

€19,6m have been allocated to this project, funded by:  

  • Normandy Region Council: €9,4 M
  • Seine Maritime Council: €3,3 M
  • Europe (FEDER): €2 M
  • French State: €4.9 M
Gallery
Essais de mise en lumière
©Francois-Thomas
Pont Colbert
©Francois-Thomas
Pont Colbert
©Francois-Thomas
Pont Colbert
©Francois-Thomas
Press release(s)
Project schedule
Choix des prestataires travaux
Mars 2023
Préparation du chantier
1er semestre 2024
Fermeture de l'ouvrage à la circulation
24 janvier 2024
Fin de chantier
2026