Registered as a historic monument in 2020, Colbert Bridge will be undergoing a complete restoration. Its structure, comprising a mixture of the original puddled steel and post-war steel, is in very poor condition and is going to be restored. We are also going to renovate its road surface and enlarge the pavements to give access to people with restricted mobility.
Civil engineering works are also planned: repairs to the paving of the bridge’s turning circle, restoration of the stairs, the travel stops and the top-section of the quay... as well as the restoration of the operator’s cabin and the renovation of the power station façade. Lastly, the operation includes installing lighting to illuminate the bridge at night.
Learn more about these historic works on the dedicated website!
Brief overview
Saint-Pierre Dock is situated at the heart of Caen city centre and accommodates a marina and nautical events. Currently the depth is preventing the marina from operating to its fullest extent, including the hosting of exceptional vessels and racing events. Dredging operations in the dock and its access canal are scheduled for the winter of 2024–25 with the extraction of approximately 30,000 m³ of sediment. The sediment will be decontaminated with a view to using it for landscaping works. The Government must award an environmental permit before the project can get underway. The project has been authorized by prefectoral decrees dated October 11, 2024
In the interim, so the marina could continue to host the Normandy Channel Race, the bottom of the dock was levelled in May 2022 and June 2024. The goal was to move the sediment from the ridged areas to the hollower areas of the dock floor using a levelling bar towed by a tug.
Brief overview
The Collignon Business Park (16.8 ha) is situated in Tourlaville on the Cherbourg Peninsula. Acquired by Ports of Normandy in 2015–16 following reassignment to the public benefit, it had already been identified in 2006 as a key place for attracting business activities related to the port. The local land use plan (2006) and the territorial coherence plan (2011) confirmed the park’s importance as the only site in Greater Cherbourg and on the north coast of the peninsula which is of sufficient size, is close to the port and enjoys good road links. The park will mainly seek to attract businesses that have links to the port’s activities, to support cross-Channel logistics and the development of the marine renewable energy sector.
The development of the Collignon Business Park involves the creation of 5 plots that are divisible and suitable for building, to a total development area of approximately 10 ha. Ports of Normandy has entrusted the development of the park to SHEMA, a semi-public company involved in development, construction and economic development throughout Normandy.
Brief overview
Registered as a historic monument in 2020, Colbert Bridge will be undergoing a complete restoration. Its structure, comprising a mixture of the original puddled steel and post-war steel, is in very poor condition and is going to be restored. We are also going to renovate its road surface and enlarge the pavements to give access to people with restricted mobility.
Civil engineering works are also planned: repairs to the paving of the bridge’s turning circle, restoration of the stairs, the travel stops and the top-section of the quay... as well as the restoration of the operator’s cabin and the renovation of the power station façade. Lastly, the operation includes installing lighting to illuminate the bridge at night.
Learn more about these historic works on the dedicated website!
Brief overview
Saint-Pierre Dock is situated at the heart of Caen city centre and accommodates a marina and nautical events. Currently the depth is preventing the marina from operating to its fullest extent, including the hosting of exceptional vessels and racing events. Dredging operations in the dock and its access canal are scheduled for the winter of 2024–25 with the extraction of approximately 30,000 m³ of sediment. The sediment will be decontaminated with a view to using it for landscaping works. The Government must award an environmental permit before the project can get underway. The project has been authorized by prefectoral decrees dated October 11, 2024
In the interim, so the marina could continue to host the Normandy Channel Race, the bottom of the dock was levelled in May 2022 and June 2024. The goal was to move the sediment from the ridged areas to the hollower areas of the dock floor using a levelling bar towed by a tug.
Brief overview
Saint-Pierre Dock is situated at the heart of Caen city centre and accommodates a marina and nautical events. Currently the depth is preventing the marina from operating to its fullest extent, including the hosting of exceptional vessels and racing events. Dredging operations in the dock and its access canal are scheduled for the winter of 2024–25 with the extraction of approximately 30,000 m³ of sediment. The sediment will be decontaminated with a view to using it for landscaping works. The Government must award an environmental permit before the project can get underway. The project has been authorized by prefectoral decrees dated October 11, 2024
In the interim, so the marina could continue to host the Normandy Channel Race, the bottom of the dock was levelled in May 2022 and June 2024. The goal was to move the sediment from the ridged areas to the hollower areas of the dock floor using a levelling bar towed by a tug.
Brief overview
The Collignon Business Park (16.8 ha) is situated in Tourlaville on the Cherbourg Peninsula. Acquired by Ports of Normandy in 2015–16 following reassignment to the public benefit, it had already been identified in 2006 as a key place for attracting business activities related to the port. The local land use plan (2006) and the territorial coherence plan (2011) confirmed the park’s importance as the only site in Greater Cherbourg and on the north coast of the peninsula which is of sufficient size, is close to the port and enjoys good road links. The park will mainly seek to attract businesses that have links to the port’s activities, to support cross-Channel logistics and the development of the marine renewable energy sector.
The development of the Collignon Business Park involves the creation of 5 plots that are divisible and suitable for building, to a total development area of approximately 10 ha. Ports of Normandy has entrusted the development of the park to SHEMA, a semi-public company involved in development, construction and economic development throughout Normandy.
Brief overview
Registered as a historic monument in 2020, Colbert Bridge will be undergoing a complete restoration. Its structure, comprising a mixture of the original puddled steel and post-war steel, is in very poor condition and is going to be restored. We are also going to renovate its road surface and enlarge the pavements to give access to people with restricted mobility.
Civil engineering works are also planned: repairs to the paving of the bridge’s turning circle, restoration of the stairs, the travel stops and the top-section of the quay... as well as the restoration of the operator’s cabin and the renovation of the power station façade. Lastly, the operation includes installing lighting to illuminate the bridge at night.
Learn more about these historic works on the dedicated website!