The maintenance facility development is situated in the outer harbour, to the north of Gaston Lalitte quay. It comprises:
- A footprint of 4,800 m²
- A four-storey office building with a with a canteen/rest area on the first floor and various services on the ground floor, such as storage areas, cloakroom, first aid room and technical facilities
- A car park for 37 vehicles
- A pontoon which can accommodate three 27-metre vessels
- A dockside cargo crane
Ports of Normandy will prepare the plot of land and everything relating to mooring the ships. Eoliennes en Mer Dieppe - Le Tréport (EMDT) will build the building and the car parks. Currently, the Gaston Lalitte quay is used for unloading aggregates from the sea and heavy cargo onto hardstanding covering more than 50,000 m². The development works directed by Ports of Normandy (rip-rap, dredging and pontoon construction) will be situated where the Gaston Lalitte quay meets the East pier.
Useful information
Document(s)
Click to upload
La Normandie pionnière de la filière EMR
Document
Parc éolien de Dieppe le Tréport
Document
Parc-eolien-Dieppe-LeTreport-Plaquette.pdf (850.4 KB)
Impacts du parc éolien Dieppe le Tréport
Document
Questions-réponses Parc éolien Dieppe le Tréport
Document
Project schedule
Studies
1st half year 2024
Project start
2nd half year 2024
Project end