Adaptation permanente du Port de Cherbourg aux EMR EN
Brief overview
Ports of Normandy chose very early on to invest massively in adapting its infrastructures to the needs expressed by the offshore bottom-fixed wind turbine industry. In the Port of Cherbourg we extended the port by 39 ha so that industrial operators could use 100 ha of hardstanding devoted to marine renewable energies and a heavy-lift quay able to accommodate up to 50 tonnes per m². Today, Cherbourg is home to numerous industrial operators which are involved in the manufacture of bottom-fixed wind turbines for Saint-Brieuc, Courseulles-sur-Mer and Fécamp as well as the LMWP factory which makes blades for the Haliade X-14MW.
Ever the pioneer, Ports of Normandy intends to continue the adaptation of its infrastructure so that it can meet the needs of the floating wind turbine sector. Calls for tenders are emerging and the industry is beginning to express its needs for manufacturing floating platforms (which can measure up to 100 m²), launching them and installing the wind turbines on them. The major part of tomorrow’s wind turbine market will be floating turbines. For Ports of Normandy this means exploiting the existing investments and consolidating them so they can satisfy the new needs. Surveys will be undertaken to prepare the ground for these investments.