Platform for pre-assembling offshore wind turbines for the Fecamp wind farm

Brief overview 

Ports of Normandy has just completed, on behalf of Eoliennes Offshore des Hautes Falaises (EOHF), the development of 15 ha of hardstanding in the Port of Cherbourg. It will accommodate the hub for storing and pre-assembling the components of the wind turbines for the future wind farm off Fécamp. 

 

Part of this hardstanding is occupied by road structures and a system for draining rainwater. Ports of Normandy has built the connecting roads and all the various networks (high voltage AC supply, drinking water supply, waste water drainage, communications...) and upgraded (reinforced and reconfigured) the existing structures so that they satisfy the specific technical demands of the future user.

 

A platform able to withstand 50 tonnes per m² was built adjacent to the quay.

 

creation-dune-plateforme-de-pre-assemblage-des-eoliennes-en-mer-du-champ

Budget

Approximately €6M, 100% funded by EOHF.

Gallery
PortdeCherbourg-EMR-Hub edf
©Gael Arnaud
PortdeCherbourg-EMR-Hub edf ©Gael Arnaud
©Gael Arnaud
PortdeCherbourg-EMR-Hub edf
©Gael Arnaud
Port de Cherbourg quai des Flamands
©Biplan
Project schedule
Start date of works
December 2021
End date of works
June 2022
Site reception by Siemens Gamesa
November 2022
Arrival of the first wind turbine components
Early 2023
Assembly of the first wind turbines
2nd half 2023